Independently Tested at Intertek – Plano, Texas
Report No: Q9217.01-801-44-R0
The shelter successfully received all required ICC 500 missile impacts without perforation.
• No penetration through doors, walls, or roof
• Vision panel resisted impact
• Deformation remained within ICC limits
The product met ICC 500-2020 impact requirements.

The shelter was subjected to positive and negative pressure testing up to 300 psf (200 psf design load).
Results:
• Structure remained intact
• Doors remained latched
• No structural failure
The shelter met ICC 500-2020 static pressure requirements.

• 1/4” A36 steel plate walls and doors
• Fully welded vertical and horizontal connections
• Reinforced door perimeter
• Multi-point slide bolt latch system
• Deadbolt locking mechanism
• ICC-tested vision panel

Testing conducted at Intertek Building & Construction Laboratory
Report No: Q9217.01-801-44-R0
Testing Date: January 29–30, 2024
Full documentation available upon request.